India’s Installed Power Capacity Reaches 5.05 Lakh MW, Renewable Energy Surges

The standard bidding guidelines for tariff-based competitive bidding process for procurement of power from Grid Connected Solar, Wind, Wind-Solar Hybrid and Firm and Dispatchable RE (FDRE) projects have been issued.

​The standard bidding guidelines for tariff-based competitive bidding process for procurement of power from Grid Connected Solar, Wind, Wind-Solar Hybrid and Firm and Dispatchable RE (FDRE) projects have been issued. 

Leave a Reply